Participating library

PCRWR Library

Catalogue records discovered through PCRWR Library in Islamabad, Federal.

Visit library website 16944 catalogue records

Catalogue records

Technical Memorandum-34; Gas Insulated Switchgear; Vol. II of Supplement to Project Planning Report,PPS-2(Appendix-HHS) Author not listed 1984 Technical Memorandum-33; Orifice Spillway Energy Dissipation; Vol. II of Supplement to Project Planning Report, PPS-2(Appendix-RS) Author not listed 1984 Technical Memorandum-32; Planning of Flood Protection Works for Nowshera Valley; Vol. III of Supplement to Project Planning Report,PPS -3(Appendix-US) Author not listed 1985 Technical Memorandum-31; Contract Packages for Civil Works; Vol. III of Supplement to Project Planning Report,PPS-3(Appendix-WS) Author not listed 1984 Technical Memorandum-30; Studies on Additional Installed Capacity at Kalabagh; Vol. III of Supplement to Project Planning Report,PPS -3(Appendix-ZAS) Author not listed 1984 Technical Memorandum-29; Replacing Low Level Tunnels with Orifice Spillway; Vol. II of Supplement to Project Planning Report,PPS-2(Appendix-MS) Author not listed 1984 Technical Memorandum-28; Mathematical Model Study of Reservoir Sedimentation; Vol.V of Project Planning Report, PPR-5 (Appendix-G) Author not listed 1984 Technical Memorandum-26; Irrigation Release Capacity; Vol. XI of Project Planning Report, PPR-11 (Appendix K) Author not listed 1983 Technical Memorandum-25; Project Selection and Related Optimization Studies; Vol. XI of Project Planning Report, PPR-11 (Appendix-X) Author not listed 1983 Technical Memorandum-24; Downstream Degradation; Vol. VII of Project Planning Report, PPR 7 (Appendix GG) Author not listed 1983 Technical Memorandum-23; Probable Maximum Flood and Routing Studies; Vol. IV of Project Planning Report, PPR 4(Appendix-F) Author not listed 1983 Technical Memorandum-22; Reservoir Retention Level; Vol. VI of Project Planning Report, PPR-6 (Appendix-H) Author not listed 1983 Technical Memorandum-21; Tailwater Rating Curve for Kalabagh Dam; Vol. VII of Project Planning Report, PPR-7 (Appendix GG) Author not listed 1983 Technical Memorandum-20; Project Layout Optimization Studies; Vol. II of Project Planning Report, PPR-2 (Appendix-M) Author not listed 1983 Technical Memorandum-19; Preliminary Assessment of Feasibility of Dhok Abakki Pumped Storage Scheme; Vol. XIII of Project Planning Report, PPR-13 (Appendix J) Author not listed 1983 Technical Memorandum-18; Wave Run-ups Studies and Design of Rip-rap for Embankment Protection; Vol. VII of Project Planning Report, PPR-7 (Appendix GG) Author not listed 1983 Technical Memorandum-16; River Diversion; Vol. IX of Project Planning Report, PPR-9 (Appendix NN) Author not listed 1983 Technical Memorandum-14; Review of Case Histories of Sediment Sluicing; Vol. V of Project Planning Report,PPR-5 (Appendix G) Author not listed 1983 Technical Memorandum-13; Preliminary Backwater Studies; Vol. VII of Project Planning Report, PPR-7 (Appendix-GG) Author not listed 1983 Technical Memorandum-12; Preliminary Studies of Reservior Sedimentation; Vol. V of Project Planning Report, PPR-5 (Appendix-G) Author not listed 1983