Participating library

PCRWR Library

Catalogue records discovered through PCRWR Library in Islamabad, Federal.

Visit library website 16944 catalogue records

Catalogue records

Pannel of Experts First Meeting (20 February, 1983); Vol. XIII of Project Planning Report, PPR-13 (Appendix-AA) Author not listed 1983 FIELD AND LABORATORY RESULTS; Vol.1-VI: Bore hole/ Drill hole logs-Left Bank; Vol.V-IX: Bore hole/ Drill hole logs-Right Bank; Vol.X: Bore hole/ Drill hole logs-Riprap Querries Said Mar Querry Hanjar Querry; Vol.XI-XII: Trench logs-Left Bank; Vol.XIII: Trench logs-Right Bank; Vol.XIV-XV: Test Pit logs-Left/ Right Bank; Vol.XVI: Adits and Shafts logs-Left/ Right Bank Volume Vol.1-XVI Author not listed 1987 Summary Report of Kalabagh Dam Project; Feasibility Study Author not listed 1975 Project Economics; Feasibility Study Volume Vol.7 Author not listed 1975 Project Cost; Feasibility Study Volume Vol.6 Author not listed 1975 Project Features; Feasibility Study Volume Vol.5 Author not listed 1975 Foundations Construction Materials; Feasibility Study Volume Vol.4 Author not listed 1975 Geology; Feasibility Study Volume Vol.3 Author not listed 1975 Reservoir Operation; Feasibility Study Volume Vol.2 Author not listed 1975 Hydrology; Feasibility Study Volume Vol.1 Author not listed 1975 Design Report-5; River Diversion Author not listed 1987 Addendum to Design Report-4; Power and Convertible Conduit Features, Civil Works and Gates Author not listed 1988 Addendum to Design Report-3; Spillways Author not listed 1988 Dams and Embankments: Addendum to Design Report-2 Volume Vol.1 & 2 Author not listed 1988 Project Report; Supplemental Documentation; TM-49: Impact of Kalabagh Dam on Sailaba Cultivation in Sind and Sea Water Intrusion in the Indus Estuary; TM-50: Kalabagh Reservoir Filling Study; TM-51: Mathematical Model of Kalabagh Sedimentation Senstivity Study; Environmental Impact of Kalabagh Dam on Mangrove Forest Fisheries and Drinking Water Mardan, Pabbi and Swabi SCARP Areas after Construction of Kalabagh Dam Volume Vol.4 Author not listed 1988 Project Report; Supplemental Documentation; Navigation Assessment; Jinnah Barrage Studies Volume Vol.3 Author not listed 1988 Project Report; Supplemental Documentation; TM-48: Selection of the Modified Project Proposal for Lowering Powerhouse; Parameters of Turbines for Modified Project; Effect of Tailwater Level on Operation of Powerstation; Gas Insulated Switchgear (GIS) Equipment; TM-44: Future Use of Level Outlet; TM-43: Irrigation Release Capacity; Project Cost Estimate-June 1987 Prices; TM-46: Economic Evaluation Modified Project; Note on Contract Packages for Civil Works Volume Vol.2 Author not listed 1987 Project Report; Supplemental Documentation; TM-45: Probable Maximum Flood and Routing Studies; for Modified Project; TM-47: Mathematical Model Study of Kalabagh Reservoir Sedimentation Volume Vol.1 Author not listed 1987 PROJECT REPORT; Introduction and Summary; The Site-Physical Conditions; The Reservoir and Surrounding Area Irrigation, Power and Flood; Alleviation; Alternative Sites and Layouts; Project Proposals; Construction Planning; Cost Estimates; Economic and Financial Analysis; Specific Detailed Recommendations; Conclusions; Project Data Author not listed 1988 Design Report-4; Power and Convertible Conduit Features, Civil Works and Gates Author not listed 1985