PCRWR Library
Catalogue records discovered through PCRWR Library in Islamabad, Federal.
Visit library website 16944 catalogue recordsCatalogue records
Design Report-3; Spillways
Author not listed
1985
Dams and Embankments: Design Report-2
Author not listed
1985
Design Report-1; Hydroelectric Plant, Appendices 1.6-1.9 Volume Vol.3
Author not listed
1985
Design Report-1; Hydroelectric Plant, Appendix 1.1-1.5 Volume Vol.2
Author not listed
1985
Design Report-1; Hydroelectric Plant: Main Report Volume Vol.1
Author not listed
1985
Project Planning Report: Supplement; Appendices; Appendix AS: Terms of Reference; Appendix AAS: Panel of Experts; Appendix US: Resrvoir Works; TM-32: Planning of Flood Protection Works for Nowshera Valley; Appendix WS: Construction Planning; TM-31: Contract Packages for Civil Works; Appendix XS: Project Operation; TM-37: Power-oriented Conjuctive Operation of Tarbela and Kalabagh Reservoirs; Appendix YS: Cost Estimates; Appendix ZAS: Economics and Finance; TM-30: Studies on Additional Installed Capacity at Kalabagh; TM-39: Supplementary Studies on the Economics of Additional Installed Capacity at Kalabagh; TM-41 :Investigation of El.932 Top Water Level Volume Vol.III
Author not listed
1985
Project Planning Report: Supplemenet; Appendices; Appendix MS: Project Layout Studies; TM-29: Replacing Low Level Tunnels with Orifice Spillway; TM-35: Low Level Outlet Works. Flip Bucket Plung Pool Alternative; TM-36: Dam Section over the Power and Low Level Conduits; TM-38: Handling of Kharjwan Nala; TM-40: Layout of Left Bank Works; Appendix RS: Orifice Spillway; TM-33: Orifice Spillway Energy Dissipation; Appendix HHS: Power Aspects; TM-34: Gas Insulated Switchgear; TM-42: Turbine Relief Valves Volume Vol.II
Author not listed
1985
Project Planning Report: Supplement; Main Report, Introduction and Summary; Appendix-25 Project Features, Cost Estimates; Economic and Financial Analysis; Project Data; Update of Project Economics Volume Vol.I
Author not listed
1985
Project Planning Report; Miscellaneous; TM-19: Preliminary Assessment at Dhok Abbaki; Pumping Storage Scheme; Appendix A: Terms of Reference; Appendix AA: Pannel of Experts; Appendix B: Topography and Surveys; Appendix J: Dhok Abbaki Pumped Station; Appendix L: High Level Outlet Works Volume Vol.XIII
Author not listed
1984
Project Planning Report; Project Cost and Economics; Appendix Y: Cost Estimates; Appendix Z: Economics and Finance Volume Vol.XII
Author not listed
1984
Project Planning Report; Project Report; Appendix K: Irrigation Release Capacity; Appendix X: Project Operation Volume Vol.XI
Author not listed
1984
Project Planning Report: Construction; Appendix V: Construction Material; Appendix W: Construction Planning Volume Vol.10
Author not listed
1984
Project Planning Report; Project Features; Appendix N: Design Principles; Appendix NN: River Diversion; Appendix P: Low Level Outlet Works; Appendix Q: Overflow Spillway; Appendix R: Orifice Spillway; Appendix S: Power Features; Appendix T: Embankment Dams; Appendix U: Reservoir Works Volume Vol.IX
Author not listed
1984
Project Planning Report; Power Aspects; Appendix HH: Power Aspects; Appendix MW: Material Wear Investigations Volume Vol.VIII
Author not listed
1984
Project Planning Report; Hydraulic Studies; Appendix-GG: Hydraulic Studies; TM-18: Wave Runup Studies and Design of Riprap for Embankment Protection; TM-13: Preliminary Backwater Studies; TM-21: Tailwater Rating Curve for Kalabagh Dam; TM-24: Downstream Degradation Volume Vol.VII
Author not listed
1984
Project Planning Report; Reservoir Area; Appendix H: Reservoir Area Volume Vol.VI
Author not listed
1984
Project Planning Report; Appendix G: Sediment Studies; TM-2: Review of Existing Sediment Data; TM-3: Sedimentation Studies: Proposal for Further Data Collection; TM-14: Review of Case Histories of Sediment Sluicing; TM-12: Preliminary Studies of Reservoir Sedimentation; TM-28: Mathematical Modelling of Reservoir Sedimentation Volume Vol.V
Author not listed
1984
Project Planning Report; Hydrology and Flood Studies Appendix E: Meteorological Criteria to Probable Maximum Flood; Appendix EE: Hydrology; Appendix F: Flood Studies Volume Vol.IV
Author not listed
1984
Project Planning Report; Geology and Geotechnical Assessment Appendix C: Geology; Appendix D: Geotechnical Assessment; Appendix DD: Seismotectonic Studies Volume Vol.III
Author not listed
1984
Project Planning Report; Project Layout Studies; TM-1: Confirmation of Site; TM-4: Choice of Site; TM-20: Project Layout Optimization Studies; Appendix-M: Project Layout Studies Volume Vol.II
Author not listed
1984