Checking Embayment at Spur 1-A Upstream of Taunsa Barrage, Hydraulic Model Study
Bibliographic details
Summary
A curved headed spur with a radious of 600 ft. be provided along the shank of spur-1-A. This would provide due safety to the remaining part of the spur shank and would also cater for further deepening of the river embayment above it. A J-head spur be constructed along the spur shank of the existing mole head spur-1. This would deminish the roller formation tendency in between spurs-1-A and 1, and would straighten the approach towards Taunsa Barrage with the present set of conditions. An additional J-spur -2-A be also considered for construction at site in between the spurs -1-A and 2. This would ultimately restrict the river embayment in the gap which may occur in future times if the river approach becomes adverse further upstream. The geomatry of J-spur head is to be kept the same as that of the J-spur-1.(L.B.)