Training of River Indus at Dera Ismail Khan Bridge, Hydraulic Model Study
Bibliographic details
Summary
Hydraulic model experiments were performed for training of river Indus downstrem and upstream of D.I. Khan bridge to protect the right bank especially in front of Gomal University and Villages Roda and Jeda. In the light of experimental analysis it was recommended that proper maintenance is required at spur No.18-A, similarly location and alignment of spur No.18-B and 18-C is proposed. The shape and geomatry of proposed spurs is kept same. It is stressed that the top levels of the apron of the spurs should be kept at winter water level at the site.(L.B.)