River Training Below Shahdara Waste Water Treatment Project Hydraulic Model Study (Phase-I)
Bibliographic details
Summary
Purpose of this study was to protect the site for the installation of Shahdara Waste Water Treatment Plant.In the view of experimental analysis, stage wise, protection works are recommended to enclose the proposed waste water treatment plant. In the first stage stone pitching of front face of bund alongwith provision of proper apron for the remedial measure is suggested. In the phase III, a cunnette alongwith a closure bund, straight part of the project bund starting from the tail end of the head of spur-6 In phase II, be extended straight and join with the upstream nose of the head of the existing spur just upstream Shahpur village. Neccessary stone pitching and stone apron may also be provided along the front face of the bund.