Pilot Scale Waste Stabilization Ponds Performance

By KHURSHID AHMAD

Bibliographic details

Summary

The climate of Lahore is most suitable for the treatment of waste water stabilization ponds. Under a planned programme waste water consisting of 80% domestic and 20% industrial waste was treated in anaerobic, facultative and maturation pilot scale waste stabilization ponds. The anaerobic pond took approximately 50 days to develop an environment conductive to methane fermentation. No significant odour problem was noted, as a result of low sulphate content and to a limited loading of 0.04kg BOD/m3 day. Also the concentration of alkali and alkaline earth cations were within the limit to cause inhibition, they may be considerd to be rather stimulatory. Also due to the low concentration of heavy metals there was no possibility of metal toxicity as well. The performance of anaerobic pond in phase I was not satisfactory in terms of BOD (Biological Oxygen Demand) and COD (Chemical Oxygen Demand) removal. Most of the reduction took place as a result of sedimentation. The cause of its poor performance was found due be oil and grease which was coming with the influent at a concentration of 159 mg/1. When oil and grease was stopped, the pond efficiency increased to 60 and 60.2% in terms of BOD and COD removal. Also decrease in the sulphide content was noted. Like anaerobic pond, the performance of facultative ponds were also poor in phase I study.