PakCat catalogue record

Analog Model Studies for Evaluating the Feasibility of Groundwater Development in the Dhamrah Kas Area West Pakistan

By Gilani, Maqsood Ali Shah

Bibliographic details

Summary

The Dhamrah Kas area is an alluvial plain with an area of about 54 square miles adiacent to the Haro River betwen Hassan Abdal and Taxila, northeast of Rawalpindi. Water and Soils Investigation Division has carried out investigations in the area with a view to evaluate ground wter potentials. The results of these investigations describes the geohydrology of the area. Construction of a dam on Haro River, about 2 miles upstream of the north-eastern boundary of the Dhamrah Kas area near Khanpur, however would change the existing hydrologic conditions and the present direct recharge of ground water from Haro River would practically cease. Consideration of this change in the hydrologic boundary conditions int he area demanded furtehr investigations to be carried out. Accordingly, the groundwater system in the area has been studied using electric analog model techniques. Two types of studies were carried out. Firstly, the existing ground water system, namely, the conditions prior to the construction of Khapur Dam, was studied. Secondly, the ground water system was studied for the changed conditions, namely the conditions when the Khapur Dam is constructed and the direct recharge to the ground water in the area from the Hare River is checked. The ground water budget of the area for the existing steady state conditions has been determined. It is found that presently the Haro River is the major soruce of recharge to ground water and is recharging at a rate of 183 cusecs. The other recharge sources are infiltration through the Margala hills and the underflow from eastern upper reaches. The rate of recharge from these two later sources has been obtained to be 20 cusecs and 7 cusec respectively. It has also been found that the discharge of ground water from the area to maintain equilibrium conditions is distributed in such a manner that 40 cusecs of water leves the are as ground water outflow through the north western boundary and the rest 170 cusecs of ground water is lost through space and into the nullahs in the area. The second study was made to find out the feasible rate of ground water withdrawal so as the ground water levels in the area do not decline to serious depths. Three different rates of withdrawal over the area have been attempted and the decline in water levels for 50 years of continous pumping have been observed. These net rates of withdrawal are 60 cusecs, 40 cusecs and 30 cusecs. Change maps descriping the projected decline for periods of 10, 20 and 50 years of continous pumping have been prepared. It is observed that 40 cusecs of net withdrawal is an appropirate figure. In this case the maximum decline in ground water levels in the productive aquifer would be of the order of 5-10, 5-20 and 10-30 feet for the respective aquifer would be of the order of 5-10, 5-20 and 10-30 feet for the respective 10, 20, 50 years of continous pumping. However, in the productive aquifer the drawdowns would be higher and would range upto 20, 30 and 50 feet for the continous pumping peirod of 10, 20 and 50 years respectively.