Training of River Ravi at Balloki Head Works, Hydraulic Model Study
Bibliographic details
Summary
The river Ravi upstream of Balloki Headworks takes extreme meanders. In order to make the headworks fully operable to pass the seasonal floods, a number of training works were constructed in the past projecting from both the flanks to train the river to approach the headworks somewhat straight. It is noted that the spur No.2 and 4 particularly are so close from either side that these spurs cause constriction, raise flood heights and in turn cause out flanking of marginal bunds as well as damages to others spurs in addition to their own maintenance problem. In view of this situation, the experiments were carried out on a scale model to find out as to how the passage to super flood flows is improved, the marginal bunds are protected and damages to the training works upstream and downstream of headworks are avoided. It is proposed that neccessary measures may be taken to introduce 2 Nos. sloping spurs along right marginal bund and one groyne Lower Bari Doab Canal togather with cutting short the spur No.2 by 600ft. with a small by-pass cunnette. (L.B.)