Intake Structure Modification Combined Cycle Plant at Guddu, Hydraulic Model Study
Bibliographic details
Summary
The model of intake structure of Guddu Power House was set up to study the sediment problems of Guddu 600 MW combined cycle pump house and to test various alternatives proposed by the consultants and Irrigation Research Institute to reduce sediment entery and improve feeding arrangements of pump house. It was noted from the location plan of pump house Guddu 600 MW power plant that most of trouble was due to the intake structure which was located on the inside of bend of Sind Beghari feeder canal and it was in the process of siltation due to unsatisfactory regulation at its head. It was noted that a heavy influx of sediment entrened in to the intake structure due to improper location and also due to the accreted bed of the canal it self. In order to stop the sliping of the canal sediment into the power intake structure the direct flow towards intake was avoided by providing sloping spurs in the bed of the canal which reduced the sediment into intake structure by about 36%. It was decided that against each bay four pipes of 72 inches size be tried. Two pipes below and two pipes above in line so that the gates could be operated without difficulty at various stages of the canal flow to get the 2 pump discharge requirement at minimum level in Sind Beghari canal. The test run showed that 2 pump discharge requirement is met at minimum R.L. 247.7.(L.B.)