PakCat catalogue record

Protecting Mouza Khar Gharbi Downstream Taunsa Barrage, Hydraulic Model Study

By ABDUL SHAKOOR

Bibliographic details

Summary

The perusal of the survey plan indicated that the main channel of river Indus was embaying deeply against Sharti groyne in Mouza Khar Gharbi downstream of Taunsa Barrage. It was apprehended that further development of river Indus in this area would create intense erosion taking into its wake Mouza Khar Gharbi. The results showed that the embayment opposite Sharti groyne had reached its maximum as shown by the back roller appearing for all discharges from 50,000 cusecs to 550,000 cusecs. As discharge increased, the main flow appeared to be straightened out in the reach opposite Sharti groyne. There was a tendency of opening up of a channel through the big sandy bela at the centre of the channel. With the given set of conditions prevailing at site it appeared that the river pressure at the study point had subsided and it was undergoing a favourable change. It would be worthwhile to watch the river for quite some time than to propose any training works at this place. (LB)