Training Works Upstream Guddu Barrage, Hydraulic Model Study
Bibliographic details
Summary
The perusal of river survey plan and other data supplied by the concerned authority shows that rigt bank of Guddu Barrage is constructed unsymmetrical in design and shape at the upstream end. The left guide bank of the barrage is proper where as the right guide bank is improper. To cover up this discrepency, detailed experiments were initiated at Sogreah Laboratories France. A scheme comprising three sets of training works upstream to guide the river smooth and straight towards the barrage were proposed. It is noted that original scheme of training works has not been carried out at site. Only first pair of training works was got constructed at site and that too not at their recommended places. During the year 1989 it resulted in the damage of the right guide bank of Guddu barrage in the reach of R.D. 4.2 to 4.4, which was checked by field formation by constructing studs at an intreval of 100 to 200 ft. which saved the situation. In order to remedy the situation on permanent basis the model experiments were performed at IRI, Lahore. It was recommended that a 1100 ft. long guide spur be constructed at site. The shank of the spur is to be tied with the shank of the existing right spur. The portion of the spur shank within the deep channel may also be protected by stone pitching at both sides. (L.B.)